top of page

100th Avenue North St. Pete Aprons

paverforge
Oct 4
1 min read

100th Avenue North is the next grid street north of the Shore Acres approaches we already cover. Aprons here take the turn-in from the curb and the daily load of two cars. Thin concrete patches at the sidewalk are the usual failure.

What we rebuild

If the upper driveway is sound, we replace the apron only. The new field sits on compacted aggregate, meets the sidewalk without a lip, and pitches to the gutter. Edge restraint stays at the public joint so the pavers do not creep after the first summer.

  • Apron scope separated from a full driveway when the upper field is locked

  • Base sized for turning loads at the street

  • Sidewalk elevation matched before the field is set

  • Joint sand locked after compaction

Quote

Call PaverForge Hardscapes at 727-490-9798 or book a walkthrough at paverforge.com/book-online.

 
 
 

Recent Posts

See All
Flush Seawall Gas Meter Isolation Pads

Flush seawall gas meter isolation pads provide stable, level mounting for gas meters at the seawall while keeping access easy and the surface flush.

 
 
 

Comments


  • Facebook
  • Instagram
  • Yelp

Contact Us

St. Pete Beach, Florida

727-490-9798

© 2023 by PaverForge Hardscapes. All rights reserved.

bottom of page