top of page

Dock Fender Footing Collars

paverforge
Oct 3
1 min read

Fender boards and piling footings punch through canal patios. The paver field around them settles first, because the original install stopped at the steel and left a sand pocket.

PaverForge Hardscapes cuts flush footing collars so the patio meets the hardware without a loose ring. We work St. Pete Beach, Tierra Verde, and the Pinellas canal streets from one shop.

Collar, not a dock rebuild

We restrain the field, compact the pocket, and set pavers tight to a sleeve or a plate the marine contractor already owns. We do not weld fenders or move pilings.

The collar stays flush for bare feet and cart wheels. Joint sand is held back from the steel so rust stain has a place to wipe, not a sand joint to dye.

Start with a photo

Call 727-490-9798. A photo of the settled ring and the fender plate tells us if a collar is the right fix.

 
 
 

Recent Posts

See All
Flush Seawall Gas Meter Isolation Pads

Flush seawall gas meter isolation pads provide stable, level mounting for gas meters at the seawall while keeping access easy and the surface flush.

 
 
 

Comments


  • Facebook
  • Instagram
  • Yelp

Contact Us

St. Pete Beach, Florida

727-490-9798

© 2023 by PaverForge Hardscapes. All rights reserved.

bottom of page