top of page

Flush Seawall Mooring-Bitt Base Plates

paverforge
Oct 6
1 min read

A mooring bitt is the short post a dock line actually loads. On Pinellas seawalls the failure is usually the base, not the bitt. A plate that sits proud of the cap catches lines, toes, and carts. A plate that is only lagged into spalled concrete works loose after a season of tide and boat pull.

What a flush plate is doing

We cut a recess in sound cap concrete, set a plate that finishes flush with the walking surface, and fasten it into concrete that can take the load. The plate is not a patch over a crack. If the cap is already hollow under the old bolts, that concrete comes out and the recess is rebuilt before the bitt goes back.

The plate stops short of the cap joint. Tying a bitt across a moving joint just pries the next panel. Lines still need a fair lead so they do not saw the cap edge. That is a layout choice, not an extra bolt.

What we need before we schedule

  • A photo of the existing bitt, the bolts, and any rust stain on the cap

  • Whether the line lead crosses a cap joint

  • Access from the yard, not only from the boat

  • Any other hardware in the same cap run we should not bury

PaverForge Hardscapes sets flush seawall hardware with the same crew that builds the pads and walks. Call 727-490-9798.

 
 
 

Recent Posts

See All
Flush Seawall Gas Meter Isolation Pads

Flush seawall gas meter isolation pads provide stable, level mounting for gas meters at the seawall while keeping access easy and the surface flush.

 
 
 

Comments


  • Facebook
  • Instagram
  • Yelp

Contact Us

St. Pete Beach, Florida

727-490-9798

© 2023 by PaverForge Hardscapes. All rights reserved.

bottom of page