top of page

Flush Seawall Mooring Bollard Base Plates

paverforge
Oct 3
1 min read

A mooring bollard set through a finished paver cap will rock the field if the base plate sits proud or if the pavers are cut tight against the bolts. On Pinellas seawalls that plate needs a flush seat and an isolation joint.

What the plate detail does

PaverForge sets a flush plate or collar in the cap so the bollard base bears on its own pad, not on the paver bedding. The field stops at an isolation joint, and a small access margin stays open for bolt checks without tearing up the walk.

This is a hardscape detail around hardware the dock or seawall contractor specifies. We do not design the seawall, the embedment, or the mooring load. We keep the paver cap from becoming the thing that fails first.

How to start a bollard-plate quote

Call 727-490-9798. Send the bollard spacing, a photo of the cap, and whether the plate is new or already bolted down. We serve St. Pete Beach, Treasure Island, Madeira Beach, and the Pinellas canal lots from the same shop.

 
 
 

Recent Posts

See All
Flush Seawall Gas Meter Isolation Pads

Flush seawall gas meter isolation pads provide stable, level mounting for gas meters at the seawall while keeping access easy and the surface flush.

 
 
 

Comments


  • Facebook
  • Instagram
  • Yelp

Contact Us

St. Pete Beach, Florida

727-490-9798

© 2023 by PaverForge Hardscapes. All rights reserved.

bottom of page