top of page

Flush Seawall Railing-Post Base Plates

paverforge
Oct 4
1 min read

A seawall railing post often lands in the middle of a paver cap walk. The base plate is wider than a joint, and a bolt head that sits proud becomes a trip edge.

Cutting the field every time a marine contractor needs the bolts leaves a patch that rocks. Water trapped under the plate works the sand out of the joints.

A plate that can come off

We set a flush isolation pad under the plate, with a bond break so the steel does not lock to the pavers. Bolt heads sit in a recess. The cap walk stays continuous around the pad.

The marine contractor can lift the plate without sawing the pattern. We do not claim the pad replaces a structural seawall repair. It only keeps the finished walk serviceable.

PaverForge Hardscapes is based in St. Pete Beach. Call 727-490-9798 or book at https://www.paverforge.com/book-online.

 
 
 

Recent Posts

See All
Flush Seawall Gas Meter Isolation Pads

Flush seawall gas meter isolation pads provide stable, level mounting for gas meters at the seawall while keeping access easy and the surface flush.

 
 
 

Comments


  • Facebook
  • Instagram
  • Yelp

Contact Us

St. Pete Beach, Florida

727-490-9798

© 2023 by PaverForge Hardscapes. All rights reserved.

bottom of page