Setting a Whole-House Battery-Cabinet Isolation Pad in a Pinellas Side Yard

paverforge
Sep 30
1 min read

Whole-house battery cabinets are showing up on Pinellas side yards after solar upgrades. The cabinet needs a level pad, a service clearance, and a walk that does not lip against the skirt.

Clearance and drainage

We set the pad on compacted base, independent of the house slab, and we keep the walking surface a step below the cabinet threshold so water does not sit on the seal. Conduit from the meter or inverter is sleeved before pavers go down.

Side yards flood in a summer storm. The field pitches to the swale or a pop-up, not back at the stucco. We leave a joint the electrician can open without pulling the whole border if a later feeder change is required.

How to start

Call PaverForge Hardscapes at 727-490-9798. Send the cabinet cut sheet and a photo of the side-yard gate. We coordinate the pad with the electrical setback instead of paving first and cutting later.

 
 
 

Recent Posts

See All
Flush Seawall Gas Meter Isolation Pads

Flush seawall gas meter isolation pads provide stable, level mounting for gas meters at the seawall while keeping access easy and the surface flush.

 
 
 

Comments


  • Facebook
  • Instagram
  • Yelp

Contact Us

St. Pete Beach, Florida

727-490-9798

© 2023 by PaverForge Hardscapes. All rights reserved.

bottom of page