A Florida-room or sunroom addition often leaves the old patio sitting two inches low against a new slab edge. Water then sits at the stucco and the first row of pavers turns into a gutter. PaverForge Hardscapes rebuilds that field to the new elevation.

Match the new slab, isolate the old

We do not mortar the first row to the addition slab. A bond-breaker and a tight isolation joint keep the house and the patio from fighting each other when the addition settles a little more than the yard.

If the existing patio can be lifted and reset, we reuse the units and only add a border or a band where the geometry changed. If the pitch is wrong across the whole field, we excavate and rebuild rather than stacking sand under the low side.

Doors and screens

Impact sliders and screen-room doors need a clear swing and a threshold that does not scoop rain inside. We set finished grade below the weather seal and pitch away from the wall at about two percent.

If a contractor just poured a Florida room against your patio, call PaverForge Hardscapes at 727-490-9798 before the first wet season locks the problem in.

Recent Posts

See All
Flush Seawall Cope-Beam Joint Pads

A seawall cope beam is the concrete cap that ties the top of the wall. The joints between cope sections move with tide, temperature, and a little settlement. When a paver patio is run tight to that jo

 
 
 
Flush Seawall King-Pile Inspection Plates

A king pile is the heavier vertical member in a sheet-pile or king-pile seawall. The bolts and the pile head often sit under a paver cap walk. Cutting the field every time a marine contractor needs to

 
 
 

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
  • Facebook
  • Instagram
  • Yelp

Contact Us

St. Pete Beach, Florida

727-490-9798

© 2023 by PaverForge Hardscapes. All rights reserved.

bottom of page