Bullnose Pool Coping Overhang onto a Pinellas Paver Deck
A Pinellas pool deck fails at the waterline more often than it fails in the middle of the field. The usual cause is a first paver course shoved under the bullnose until the coping looks thick and the joint becomes a dirt shelf. Water sits there, plaster dust collects there, and the owner spends the next season bleaching a ring that should never have existed.
PaverForge Hardscapes lands the finished paver field at coping height with a hairline drip edge. After a tear-out we shoot the beam, the sliders, and the screen kick plates before a single course is set. Bullnose that already exists gets measured for overhang. New coping is coordinated with the plaster or pebble crew so the deck is not the thing that has to hide a beam that came in high.
Overhang rules we actually build to
The drip edge hangs past the first paver face. The paver does not tuck under the bullnose nose.
Isolation at the beam keeps deck movement off the shell. Bond-breakers are not optional on a new deck.
South-facing decks get expansion gaps that a north courtyard can skip. Heat is a layout problem, not a sealer problem.
Screen-cage kick plates and auto-cover tracks are set before the field is locked so we do not cut a finished course twice.
Tear-out sequencing
If the old deck is coming up, we protect the beam, photograph the existing coping elevation, and refuse to set bedding until the plaster schedule is real. A deck that is finished a week before pebble start will get walked, stained, and then blamed. We would rather leave a clean beam and come back than bury a first course to make a calendar.
Rebuilding a Pinellas pool deck and need the coping and field to meet? Call PaverForge Hardscapes at 727-490-9798 or send beam photos through https://www.paverforge.com.