top of page

Rain-Contaminated Bedding Sand Before Laying Pinellas Pavers

paverforge
Sep 16
1 min read

Pinellas gets short, hard rain on most summer afternoons. Bedding sand that sat open through that storm is no longer a consistent layer. Clay and organics wash in. Laying on it anyway is faster. It is also why the field dishes in front of the garage by next June.

What contamination looks like

  • Sand that holds a footprint instead of shearing.

  • Streaks of fines from the stockpile or the excavated subgrade.

  • Puddles in the bed that get 'worked in' instead of drained and replaced.

What we do instead

Cover stockpiles. Pull wet or dirty bedding. Re-screed a clean, damp-not-saturated layer and lay into that. If the storm hits mid-field, we stop the lay, protect the open bed, and resume on clean sand. That is slower than pushing through. It is the only way the warranty language means anything.

If an existing field already settled

We pull the dished area, check the base, and rebuild the bed. Call 727-490-9798 for a look.

Recent Posts

See All
Flush Seawall Private-Aid Daymark Base Plates

Some residential seawalls on the Pinellas bayous carry a private aid to navigation: a daymark board on a short post or a wall bracket, usually required by the permit that came with the dock. The board

 
 
 
Jasmine Street NE St. Pete Courtyards

Jasmine Street NE is a short Old Northeast block in St. Petersburg, between the Coffee Pot Bayou edge and the brick-street grid of Poplar and Locust. Lots are narrow, oaks are old, and the courtyard i

 
 
 
56th Avenue North St. Pete Aprons

56th Avenue North sits at the north end of the Fossil Park grid in St. Petersburg, closer to the Walter Fuller edge, with aprons that take a harder turn off a busier east-west street. PaverForge Hards

 
 
 

Comments


  • Facebook
  • Instagram
  • Yelp

Contact Us

St. Pete Beach, Florida

727-490-9798

© 2023 by PaverForge Hardscapes. All rights reserved.

bottom of page