Setting a Flush Pool Time-Clock Pedestal in a Pinellas Equipment Yard
Pool time clocks, salt-cell controllers, and automation panels need a level pad that stays out of splash and out of the walking surface. On many Pinellas lots the equipment yard is also the side-yard walk. PaverForge Hardscapes builds a small isolated pedestal so the panel sits dry without creating a trip at the cage door.
Pedestal details
A compact concrete or paver plinth sized to the panel footprint plus a service edge.
Isolation from the pool beam and from the screen-cage footer so vibration does not crack joints.
Pitch away from the house wall and the breaker box.
Conduit sleeves left for future bonding or a heater upgrade.
Working around an existing cage
We cut a neat opening in an existing paver deck, set the pedestal, and relay the field so kick plates and slider thresholds stay at the same height.
Schedule an equipment-yard pad with PaverForge Hardscapes at 727-490-9798. We work St. Pete Beach through Palm Harbor and Tarpon Springs.
Comments