Building a Side-Yard Firewood and Outdoor-Storage Staging Pad
A Pinellas side yard is usually the only place left for firewood, spare pavers, a covered grill, and the recycling overflow. Set that pile on soil and you stain the stucco, feed subterranean termites, and pump water toward the slab.
Keep wood off the soil
We build a compact staging pad with a slight pitch to a splash strip, a pinned edge so logs cannot roll into the AC pad, and a height that still clears the hose bib.
Pitch away from the slab
Clear the condenser coil face
Match leftover field units
Fit the equipment already there
If the lot already has a fence and a condenser, the pad is notched around both. We do not bury the disconnect or block the service door.
This is a half-day add-on on most driveway or patio jobs. Ask us to price the staging pad with the main field so the pallet color matches.
Comments