Stepping a New Patio Down From a Raised Impact-Slider Track
Impact sliders and new tracks often land higher than the slab they replaced. If you set a new paver patio dead-flat to the old grade, the door weeps onto the field and the first step is a trip. PaverForge Hardscapes designs the landing around the new track height.
The section
A flush soldier-course band at the track, a designed step or ramp run that meets code-friendly risers, and a two-percent pitch away from the house beam. Isolation at the slab so the patio can move without cracking the stucco weep.
Walk the opening
Measure the finished track, the old patio, and where water goes now. Call 727-490-9798 or book a site visit at paverforge.com/book-online.
Comments